Project Lifecycle

Where the scope sits
in a project.

21

Influence over performance is highest at concept and lowest at handover, while the cost of change moves in the opposite direction. Our scope is arranged around that reality.

1
Concept
Targets, rating selection, feasibility, massing and orientation response, early carbon and cost baselines.
2
Design
Energy and daylight modelling, façade optimization, LCA, LCC, credit strategy and design-stage evidence.
3
Procurement
Specification review, EPD and submittal assessment, tender sustainability requirements.
4
Construction
Contractor coordination, site audits, record collection, compliance verification, submission.
5
Operation
Performance verification, GHG inventory, ESG reporting, recertification and continuous improvement.
ABILITY TO INFLUENCE PERFORMANCE COST OF MAKING A CHANGE CONCEPT OPERATION
Fig. 21.1 · The case for early engagement
Our position

Sustainability consultants are frequently appointed once the design is fixed, at which point the role reduces to documenting whatever the building already is.

Appointed at concept, the same fee changes the building. We would rather argue about orientation and structural grid than write a compliance report for decisions nobody can revisit.

Certify
Measure
Optimize
Decarbonize
Project Lifecycle 21